Charlottesville Area Mountain Bike Club
Trail Work

Trail Work Performed - 2008

Date Location # People Hours Total Hours Work Performed
2008/01/06 Walnut Creek Park 1 3.5 3.5 Leafblowing
2008/01/12 Walnut Creek Park 7 3.0 21.0 Clearing blowdowns, deberming, rerouting eroded trail.
2008/01/19 McIntire Park 20 3.0 60.0 Started building the beginning of freeride style trail with UVA Mountain Bike Club. 2 log rides, 1 tabletop jump, plus some bermed turns.
2008/01/23 McIntire Park 1 2.0 2.0 Worked on jumps.
2008/01/26 McIntire Park 1 4.0 4.0 Worked on log ride and jumps.
2008/01/30 McIntire Park 1 2.0 2.0 Worked on jumps.
2008/02/03 McIntire Park 1 3.0 3.0 Worked on log ride.
2008/02/05 McIntire Park 1 2.0 2.0 Worked on log ride.
2008/02/09 McIntire Park 1 4.0 4.0 Worked on jumps.
2008/02/09 Walnut Creek Park 12 2.5 30.0 Building trail and in-sloped turn
2008/02/14 McIntire Park 1 2.0 2.0 Raking and worked on jumps.
2008/02/15 McIntire Park 2 3.0 6.0 Clearing the trail, working on the big jump, extended the berm after the jump, collected/delivered wood, cleared leaves for possible trail extensions.
2008/02/17 McIntire Park 2 3.0 6.0 Clearing the trail, working on the big jump, extended the berm after the jump, collected/delivered wood, cleared leaves for possible trail extensions.
2008/02/23 McIntire Park 1 2.0 2.0 Continued berm work.
2008/03/01 McIntire Park 1 3.0 3.0 Continued work on freeride trail section: berms, jumps
2008/03/02 Walnut Creek Park 17 3.0 51.0 Part 1 of dam loop reroute with Ditch Witch and manual finishing/old trail reclamation
2008/03/02 Walnut Creek Park 2 3.3 6.6 Walked & cleaned all the trails except red loop of impassable fallen trees.
2008/04/05 Walnut Creek Park 29 3.0 87.0 Dam loop reroute and old trail reclamation. Connector trail rebenching.
2008/04/15 Oronoco Trails 2 5.0 10.0 Cleared blowdown and opened up trail corridor.
2008/04/19 Whetstone Ridge 8 9.0 72.0 Removing blow downs, 2 areas of benching, and clearing the trail corridor.
2008/04/29 Walnut Creek Park 11 2.0 22.0 Building grade dips and clearing drainages.
2008/05/03 Walnut Creek Park 1 1.5 1.5 Clearing blow downs & closing short cuts.
2008/05/06 Walnut Creek Park 8 2.0 16.0 Building grade dips and clearing drainages.
2008/05/06 Whetstone Ridge 4 2.5 10.0 Clearing blowdowns and opening up the corridor on Kennedy Ridge.
2008/05/08 Walnut Creek Park 8 2.0 16.0 Building grade dips and clearing blowdowns.
2008/05/09 Walnut Creek Park 3 2.0 6.0 Pre-Chimney Chase scouting for downed logs to clear.
2008/05/13 Walnut Creek Park 9 2.0 18.0 Repairing water bars and clearing drainages.
2008/05/17 Walnut Creek Park 9.67 3.0 29.0 Brushing and grade dips. (NOTE: 1 person @ 5.0 hours, 8 people @ 3.0 hours)
2008/06/07 Rivanna Trail/National Trails Day Event 6 2.5 15.0 Building new trails in honor of National Trails Day.
2008/06/27 Rivanna Trail 2 2.0 4.0 Brushing
2008/06/27 Rivanna Trail 1 1.0 1.0 Brushing
2008/06/28 O-Hill 1 3.0 3.0 Brushing
2008/06/28 O-Hill 2 2.0 4.0 Brushing
2008/07/12 Mint Springs Park 7 2.64 18.5 Grade dips.
2008/07/29 Walnut Creek Park 1 1.0 1.0 Clearing blowdowns with handsaw on dam loop and red loop.
2008/08/02 Walnut Creek Park 2 2.25 4.5 Erosion control/water management.
2008/08/23 Springridge Greenway 1 2.0 2.0 Mowing.
2008/07-09/01 Preddy Creek Planning 1 35 35.0 Planning/scouting Preddy Creek.
2008/09/21 George Washington National Forest 3 11 33.0 Mechanized training and trail reroute.
2008/09/18 Albemarle County Greenway Trail at Pantops 40 3 120.0 United Way Day of Caring trailwork event.
2008/10/04 Walnut Creek Park 8 3.0 24.0 Clipping and Take A Kid Mountain Bike day trail clearing. (7 people @ 3.0 hours + 2 people @ 1.5 hours. Recorded as 8 people x 3 hours)
2008/10/11 Whetstone Ridge 3 1.0 3.0 Blowdown clearing
2008/10/24-26 Sherando / Wild Ride 6 3.0 18.0 1.5 hours on White Oak Trail, 1.5 hours on Reservoir Connector Trail
2008/11/01 Sherando 2 1.5 3.0 Clearing blowdowns.
2008/11/08 Rivanna Trail - Belvedere Spur 4 2.5 10.0 Continued work on trails.
2008/12/06-07 O-Hill 13.1666667 3.0 39.5 NOTES: On 12/6: Cut tree from the trail; on 12/7: Clear tree debris and reopen trail after cutting tree and Two major reroutes to improve sustainability. Detailed breakdown of people: 4 @ 4 hours, 9 @ 3 hours, 1 @ 2 hours, 1 @ 1.5 hours, 1 @ 1 hour, plus 1 honorary trailworker (5 yrs old) @ 0 hours.
2008/12/25 O-Hill 8.0 1.0 8.0 Marking corridor, flagging re-route, verifying/revamping trailbed, removing hanging tree on O-Hill.
2008/12/28 O-Hill 12.143 3.5 42.5 Rerouting washout and leaf-blowing. NOTE: 3 people @ 4.5 hrs., 7 people @ 3.5 hours, 1 person @ 3.0 hours, 1 person (8 yr old who did a lot of work!) @ 1.5 hours.
Total 884.6

Here are links to our trailwork totals from 2007, 2006, 2005,2004, 2003, and years past.