Charlottesville Area Mountain Bike Club
Trail Work 2006

Trail Work Performed - 2006

Date Location # People Hours Total Hours Work Performed
Jan 7, 2006 Walnut Creek 12 3.0 36.0 Rerouting section of trail on dam loop
Jan 7, 2006 Walnut Creek 1 4.0 4.0 Rerouting section of trail on dam loop
Jan 15, 2006 Walnut Creek 1 3.0 3.0 Cleared fallen trees and exposed angled roots
Jan 22, 2006 Sherando 4 0.5 2.0 Cleared blowdowns on lower White Rock Gap trail and Torrey Ridge
Jan 29, 2006 Walnut Creek Park 6 3.5 21.0 Flagged a major reroute for an Eagle Scout project, cleared blowdowns, and cleared drainages
Feb 20, 2006 Walnut Creek 4 2.85 11.4 Cleared blowdowns
March 4, 2006 Walnut Creek 2 1.0 2.0 Cleared blowdown near the lake
March 11, 2006 Walnut Creek 12 5.0 60.0 Joint project with Eagle Scouts to perform trail reroute. Pictorial.
March 18, 2006 Walnut Creek 20 2.0 40.0 3 projects
March 18, 2006 Whetstone Ridge Trail 4 6.0 24.0 Clearing blowdowns with SMBC
March 25, 2006 Delfosse Trail at Deer Rock 3 4.0 12.0 Kick off meeting with IMBA (Rich Edwards) and Nelson County Dir. of Parks and Rec. (Emily Harper) - Started corridor clearing
March 25, 2006 Delfosse Trail at Deer Rock 1 2.0 2.0 Kick off meeting with IMBA (Rich Edwards) and Nelson County Dir. of Parks and Rec. (Emily Harper) - Started corridor clearing
April 1, 2006 Walnut Creek 20 2.0 40.0 4 projects - Clearing downed trees, de-thorning, remedying sections with poor drainage
April 27, 2006 Walnut Creek 7 2.0 14.0 Grade dips
April 29, 2006 Southern Traverse 2 1.0 2.0 Blowdown clearing
May 6, 2006 Whetstone Ridge Trail 10 13.0 130.0 Brushing with SMBC, 10 people for 13 hours each.
May 6, 2006 Whetstone Ridge Trail 2 10.0 20.0 Brushing with SMBC, 2 people for 10 hours each.
May 6, 2006 Whetstone Ridge Trail 5 11.0 55.0 Brushing with SMBC, 5 people for 11 hours each.
May 6, 2006 Whetstone Ridge Trail 1 6.0 6.0 Brushing with SMBC, 1 person for 6 hours.
May 13, 2006 Walnut Creek Park 2 3.5 7.0 Brushing
May 19, 2006 Delfosse Trail at Deer Rock 1 7.0 7.0 Grade reversals and Ditch Witch education
May 22-31, 2006 McIntire Park, Rivanna Trail 1 8.0 8.0 Designing, flagging, chainsawing new McIntire Trails in preparation for RTF National Trails Day
June 3, 2006 McIntire Park, Rivanna Trail 10 3.5 35.0 Assisting RTF in constructing new trails in McIntire Park as part of 2006 National Trails Day event.
July 13, 2006 O-Hill 2 1.5 3.0 Removed blow downs
July 27, 2006 Rivanna Trail 2 4.5 9.0 Removed blow downs and cleared brush.
August 5, 2006 Walnut Creek Park 3 2.5 7.5 Removed blow downs, brushed, cleared drainage ditches and built some grade dips.
August 10, 2006 O-Hill 1 1.0 1.0 Enforcing landowner requests.
September 4, 2006 Walnut Creek Park 2 3.0 6.0 Cleared dam loop
September 7, 2006 Walnut Creek Park 2 2.0 4.0 Cleared Wilkens Way
September 8, 2006 Walnut Creek Park 1 3.0 3.0 Clearing trail of debris and blowdown
September 11, 2006 O-Hill 6 2.0 12.0 Benching, clearing blowdowns, building grade dips
September 30, 2006 Lake Sherando 11 3.0 33.0 Brushing, building grade dips
September 30, 2006 Lake Sherando 3 2.0 6.0 Rock work
October 19, 2006 Walnut Creek Park 1 1.0 1.0 Chainsawing blowdown
October 25, 2006 Walnut Creek Park 1 1.0 1.0 Clearing blowdown
November 4, 2006 Mint Springs 15 2.0 30.0 Building grade dips
November 5, 2006 Walnut Creek Park 1 3.0 3.0 Benching and clearing on Wahoo Way and other connecting trails
November 11, 2006 Walnut Creek Park - Wilkens Way 1 4.5 4.5 Clearing drainages
November 18, 2006 Mint Springs 4 3.0 12.0 Flagging new trails
November 26, 2006 OHill 3 1.0 3.0 Clearing Blowdowns
November 26, 2006 Mint Springs 2 2.5 5.0 Chainsawing new trail
December 2, 2006 Mint Springs 19 2.5 47.5 New trail construction
December 7, 2006 Walnut Creek Park 1 2.5 2.5 Mitigating erosion
December 9, 2006 O-Hill 1 1.0 1.0 Scouting
December 9, 2006 O-Hill 3 2.0 6.0 Rock armouring (Report: pdf format)
December 9, 2006 O-Hill 6 3.0 18.0 Rock armouring (Report: pdf format)
December 13, 2006 Walnut Creek Park 1 1.5 1.5 Eliminated 1 foot drop-in to creek and created newer, safer entry into the creek crossing. Cleared and reclaimed trail to connection point to Wilkins Way.
December 16, 2006 Mint Springs 9 2.5 22.5 New trail construction, benching and worked on building switchback.
December 16, 2006 Mint Springs 1 3.5 3.5 New trail construction, benching and worked on building switchback.
December 19, 2006 Mint Springs 3 2 @ 4.0, 1 @ 2.0 10.0
December 20, 2006 Mint Springs 2 2.0 4.0
December 23, 2006 Walnut Creek Park 2 4.0 8.0 Added a connector trail for the alternate stream crossing including an armored stream crossing.
November - December 2006 (ongoing) Walnut Creek Park 1 16.25 16.25 Ongoing reblazing project: Meetings w/County; trail research
Total 826.15