Trail Work Performed - 2005

Date Location # People Hours Total Hours Work Performed
Jan 2005 Walnut Creek 2 2.5 5 building grade dips
Feb 2005 Walnut Creek 11 2.25 24.75 rock hardened perpetually muddy spot
Mar 2005 Walnut Creek 8 2.5 20 trail reroute, reclaim old trail
Apr 2005 Walnut Creek 9 3.25 29.25 trail reroute, reclaim old trail
May 2005 Walnut Creek 10 2.75 27.5 clearing blowdown, building grade dips
June 2005 Rivanna Trail 5 3.5 17.5 Assisted RTF on National Trails Day
June 25, 2005 Section of trail for Richmond XTERRA 2005 7 3.0 21.0 Assisted Richmond-MORE and James River Park system bench and widen narrowed, eroding trail to be used in the XTERRA 2005 race.
July 2 2005 Sherando 1 0.25 0.25 picking up trash at the coal road
July 16 2005 Walnut Creek 4 2.75 11 brushing and clearing blowdown
August 2005 Walnut Creek 1 4.0 4.0 brushing and cleaning drainages
Sept 14 2005 O'hill 12 2.0 24.0 a reroute, grade dips, and brushing
Sept 22 2005 O'hill 5 2.0 10.0 reclaimation of former trail
Sept 23 2005 Walnut Creek 3 2.0 6.0 brushing in prep. for Take a Kid Mountain Biking Day
Sept 25 2005 Walnut Creek 3 1.66 5.0 brushing in prep. for Take a Kid Mountain Biking Day
Oct 1 2005 Walnut Creek 4 3.25 13.0 built grade dips, brushed, and cleared downed trees
Nov 9 2005 Sherando 2 5.5 11.0 scouted for upcoming trailwork dayand cleared blowdowns
Nov 12 2005 Sherando 7 6.43 45.0 Cleared blowdowns and brushed Connector Trail from Mill Creek Trail to Killer Switchback
Dec 3 2005 Sherando 9 7.22 65.0 Chucked rocks to smooth out the roughest section of the trail; benched out 50 feet of particularly eroded trailbed; brushed the Connector Trail all the way from our previous high-point (the Killer Switchback) all the way to the intersection with the Tory Ridge Trail (almost 1/2 mile!)
Dec 10 2005 Walnut Creek 2 1.00 2.00 Brushing trails
Dec 10 2005 Walnut Creek 1 2.00 2.00 Brushing trails
Dec 28 2005 Walnut Creek 2 3.5 7.00 Building grade reversals and cleaning drainages
Total 285.25